Day 5 and 6 were poor days,,but we charged some, were now at 1250 mark
We mounted the new Morningstar monitor inside and ran the cable ,,I love it they sent 100Ft. RJ11 cable ,,so it's down to rat shack for 25 Ft even then I still had some leftover
The hardest part was the temp probe I did not leave much room in the tube line
I think I over kill this job but I do that most times anyway
as you can see the readings are the output so it,s slow but getting there non the less