there was not much gain when i went up in tire size about 3/4in it still needs to go up
even when i picked it up the first day this was somthing i need to address sometime down the line
well today was the day
this photo was before
now on the back we started out with 20in
on the front 25 .5 |
well lets say i goofed up , so now to make it right
It time to Flip It
now to start off with the kit to flip 1 axle cost 65$ pr axle
now theres no way this Old boys paying 130$ +plus tax+shipping
thanks to old Cape Cod New England Enginuity Engineering ( plus the Internet)
this is how we did it, did i tell you i like to steal stuff from the internet Well Well lets say its called Improvising Engineering to work for you ( me)
well the carrier were 4.50 each x4 = 18.00$ bolts 8 and long nut 8 =8$ =26$
now can you see were im going with this
O and yes i do have a welder setup and welding time 45 mins
dam i love it when a plan works out my way
now after the flipping was done this is how it cane out SWEET
now on the outher side we had wires to deal with so it was drop the axle take the spring off put it on top and button it back on peace -O- cake
as you see the bolt is welded to thr carrer however the long nut is used to addjust that carrer to sit true with the old carrer pretty slick A
the carriers were welded to the axle even so it was not needed welding was only a stop gap backup
now as you can see we came out a lot higher
time to do this job 3hr,s with 2 coffee breaks
now in the back we went from 20 in to 24,4 = + 4.4 |
plus add 4.5in to our step up to get in the trailer as well
before |
No comments:
Post a Comment